Full Turnkey Project at Cement Works
Baldwin & Francis secure a major supply and design installation for a Cement Chlorine By-Pass Project
The project included installing an Alternative Fuel and raw material system (AFR) and a Chlorine Bypass system that reacts to an increased use of high chlorine content fuels.
This included a wide range of equipment and services from B&F including all Power and Control cabling installation and cable design, supply and install various 800Kva, 3.3KV-400V Transformer’s, various 400V Intelligent MCC’s, UPS panel’s, Indoor and outdoor lighting & a CCTV security system
The scope also required a bespoke Signals and Communication system for the Conveyors which was supplied by Baldwin & Francis.
Industry
Heavy Materials Handling & Aggregates
Products used
Medium-Voltage Motor Starters and Switchboards (MCC’s)
Low Voltage MCC’s and Switchboards
Location
Cauldon, UK